Shiawassee National Wildlife Refuge Electrical Upgrade

The U.S. Fish and Wildlife Service is seeking an electrical upgrade at the Shiawassee National Wildlife Refuge in Saginaw, MI, to increase service capacity from 50 to 100 amps.

US FISH AND WILDLIFE SERVICE


General
Closed (awarded)
140FC226Q0018
May 19, 2026 12:00 PM
May 04, 2026 05:31 PM
Small Business (SB)
Request for Proposal (RFP)
Federal
Original Solicitation Links
Contact
Rachel Williams
+15053895972
5275 Leesburg Pike, Falls Church, VA, USA
Description

This project involves upgrading the existing electrical service at the Shiawassee National Wildlife Refuge headquarters to increase its capacity from 50 to 100 amps. The scope includes evaluating and upgrading the current electrical system, replacing or upgrading components, installing higher-capacity equipment, and ensuring proper connections and load distribution. Specifically, the four-stall garage will receive an upgrade to a minimum of 100 amps, involving new wiring through existing underground conduit and the installation of a 50-amp RV-capable receptacle on the exterior of the building. Any disturbed interior finishes will be repaired. The contractor is responsible for all equipment, tools, supplies, and materials, with electricity and restroom facilities available on-site.

Classification Codes
NAICS238210Electrical Contractors and Other Wiring Installation Contractors
PSCZ1GZMAINTENANCE OF OTHER WAREHOUSE BUILDINGS
Smart Codes
electrical system upgradeunderground conduit installationrv receptacle installation
Timeline
Apr 15, 2026 12:00 PM-Site Visit (optional)
Apr 16, 2026 12:00 PM-Questions Due Date
Apr 27, 2026 12:00 PM-Period of Performance Start Date
May 04, 2026 05:31 PM-Published Date
May 07, 2026 12:00 PM-Inactive Date
May 15, 2026 12:00 PM-Period of Performance End Date
May 19, 2026 12:00 PM-Offers Due Date
Documents
TitleDate Posted
B03_WD.txtApr 09, 2026 12:00 PM
Sol_140FC226Q0018_Amd_0001.pdfApr 21, 2026 12:00 PM
Question_and_Answers_0001.pdfApr 21, 2026 12:00 PM
Sol_140FC226Q0018.pdfApr 09, 2026 12:00 PM
A04_SOW_for_Electrical_Upgrade.docxApr 09, 2026 12:00 PM