Stikine Middle School Boiler Replacement

The City and Borough of Wrangell, Alaska is seeking bids for the replacement of the boiler system at Stikine Middle School, including associated piping and controls, with an option for boiler stack replacement.

Capital Projects


General
Closed
Apr 07, 2026 10:00 PM
Invitation for/to Bid (IFB/ITB)
Local
Original Solicitation Links
Contact
Mike Howell
+19078743902
Description

This project involves the removal of the existing boiler and the installation of a new boiler system at Stikine Middle School. The scope of work includes associated hydronic piping, pumps, expansion tank, air separator, fuel oil piping, controls, and electrical connections. The base bid includes cleaning, inspection, and resealing of the existing boiler stack. An additive alternate is available for the complete removal and replacement of the boiler stack. Work will be performed in an occupied school facility, requiring coordination with the school district.

Classification Codes
NAICS238220Plumbing, Heating, and Air-Conditioning Contractors
PSCN044Installation of Equipment: Furnace, Steam Plant, and Drying Equipment; and Nuclear Reactors
Smart Codes
boiler system replacementhydronic piping installationschool facility upgrade
Timeline
Mar 24, 2026 12:00 PM-Pre-Bid Conference (optional)
Apr 07, 2026 10:00 PM-Bid Opening Date