Building FC478 and FC481 Paint and Flooring Repairs
DEPT OF THE NAVY
N4008526R9037
]building fc478 and fc481 paint and flooring repairs
This project involves the preparation, painting, and replacement of flooring systems in Buildings FC478 and FC481 at MCB Camp Lejeune. The scope of work includes painting interior and exterior surfaces, doors, door frames, and window frames, as well as repairing damaged surfaces. Flooring work involves removing existing flooring and installing new Luxury Vinyl Tile (LVT) in sleeping rooms and Epoxy Resinous Flooring in shared/common spaces and lounges, including stair treads and stairwells. All flooring transitions and cove base will also be replaced. The project requires adherence to specific paint colors and flooring types as indicated in the design basis, with the contractor responsible for ordering all materials in time to avoid delays. The facility will remain operational during construction, and contractors must coordinate their operations to minimize interference. Lead paint is present and will be scraped and encapsulated as necessary.
| Title | Date Posted |
|---|---|
| 25M033CN Building FC481 QD.pdf | May 01, 2026 12:00 PM |
| 25M034CN Building FC478 PS.pdf | May 01, 2026 12:00 PM |
| 25M033CN Building FC481 PS.pdf | May 01, 2026 12:00 PM |
| 09 65 00 RESILIENT FLOORING SPECS.pdf | May 01, 2026 12:00 PM |
| 25M033CN Building FC481 SOW.pdf | May 01, 2026 12:00 PM |
| Combined DIV 01 DBB SPECS.pdf | May 01, 2026 12:00 PM |
| 09 90 00 PAINTS COATINGS Spec..pdf | May 01, 2026 12:00 PM |
| 25M034CN Building FC478 SR.pdf | May 01, 2026 12:00 PM |
| 25M033CN Building FC481 SR.pdf | May 01, 2026 12:00 PM |
| 25M034CN Building FC478 SOW.pdf | May 01, 2026 12:00 PM |
| 25M034CN Building FC478 QD.pdf | May 01, 2026 12:00 PM |
| 25M034CN Building FC478 PD.pdf | May 01, 2026 12:00 PM |
| Contractor Environmental Guide.pdf | May 01, 2026 12:00 PM |
| RFP 25-0416.pdf | May 01, 2026 12:00 PM |
| 25M033CN Building FC481 PD.pdf | May 01, 2026 12:00 PM |