Crane Creek Greenway Section B Construction

Richland County, South Carolina is seeking bids for the construction of Section B of the Crane Creek Greenway, including pathways, retaining walls, boardwalks, and two bridges.

Richland County


General
Open
RC-801-B-26
Jun 16, 2026 02:00 PM
May 13, 2026 05:00 PM
Small Business
Invitation for/to Bid (IFB/ITB)
Local
Original Solicitation Links
Contact
Deramus Forrester
+18035762133
2020 Hampton Street, Columbia, SC, USA
Description

This project involves the construction of Section B of the Crane Creek Greenway, a part of the Richland County Sales Tax Transportation Improvement Program. The scope includes concrete pathways, a retaining wall structure, and boardwalks. Two bridges are to be constructed: Bridge A, a concrete slab structure designed to support heavy construction and maintenance vehicles, and Bridge B, a pre-engineered pedestrian structure over Crane Creek. The project also includes the installation of light poles, park benches, waste receptacles, dog waste stations, and emergency call boxes. The total length of the project is 3600 LF, beginning at the Columbia Canal headgates and extending northward along the eastern embankment of the Broad River, terminating at Crane Creek.

Classification Codes
NAICS237310Highway, Street, and Bridge Construction
PSCY1PACONSTRUCTION OF RECREATION FACILITIES (NON-BUILDING)
Smart Codes
bridge constructionretaining wall constructiongreenway development
Timeline
May 13, 2026 12:00 AM-Advertisement Publish Date
May 28, 2026 10:00 AM-Pre-Bid Meeting (optional)
Jun 04, 2026 02:00 PM-Question Submission Deadline
Jun 16, 2026 02:00 PM-Bid/Submittal Date
Documents
TitleDate Posted
Crane_Creek_Greenway.pdfMay 13, 2026 05:00 PM
B - SAMPLE Close Out DocumentsMay 05, 2026 10:30 AM
Crane_Creek_Greenway_(Addendum_#2_Revision).pdfMay 29, 2026 04:59 PM
#2 Addendum 2May 29, 2026 04:45 PM