Light Rail Vehicle Wheel Turning Machine
Santa Clara Valley Transportation Authority Engineering and Program Delivery
The Santa Clara Valley Transportation Authority (VTA) is seeking proposals for a complete light rail vehicle wheel turning machine system and a chip conveyor system. The system must include all equipment, controls, enclosures, wiring, motors, and related items necessary for a complete operating system. The work includes the delivery of manuals, drawings, training, and support goods and services. The wheel turning machine shall be a lathe-type, CNC-controlled system designed for reprofiling light rail vehicle wheelsets and shall be installed within the existing sub-floor pit for track-level operation. The chip collection and removal system must be specifically engineered for seamless integration with the wheel-turning machine and be capable of effectively collecting and conveying metal stringer chips generated during cutting operations to designated chip collection containers. The system's design must accommodate the existing pit dimensions and ensure continuous crushing and transport of metal shavings from beneath the wheel-turning machine to a chip collection container on the shop floor. The system shall be configured to accommodate the specific light rail vehicle models used by VTA and shall incorporate all required customer-specific supplementary modules. Machine installation is not part of this contract.
| Title | Date Posted |
|---|---|
| E - Attachment for drawing of the bearing box with dimensions | Sep 23, 2025 04:43 PM |
| #4 P25075A_Addendum_4_do10.8.25..docx | Oct 09, 2025 02:57 PM |
| A - Exhibit A-1 Attachments A - D | Aug 14, 2025 01:32 PM |
| #6 P25075A_Addendum_6.docx | Oct 16, 2025 04:25 PM |
| 01RFP P25075A_FINAL(archived) | Aug 14, 2025 01:32 PM |
| B - RFP P25075A Exhibit A3 - Form 3 Cost Proposal_rev1 10.2.25(archived) | Oct 03, 2025 08:49 AM |
| #1 P25075A_Addendum 1 | Sep 08, 2025 09:37 AM |
| D - Attachments to Questions and Answers #1 Responses (3) | Sep 16, 2025 04:37 PM |
| C - RFP P25075 Questions and Answers #1 | Sep 17, 2025 01:24 PM |
| P25075A Addendum No. 2 | Sep 17, 2025 01:43 PM |
| #5 IFR Notice of Addenda | Oct 10, 2025 04:31 PM |
| F - Response Attachement - Pedestal Tie Bar Drawing(archived) | Sep 26, 2025 07:28 AM |
| #3 P25075A_Addendum_3_10.225.docx | Oct 03, 2025 08:51 AM |
| #7 P25075A_Addendum_7.docx | Oct 24, 2025 01:24 PM |