Demolition Services for LaGuardia Airport Localizer Shelter
Federal Aviation Administration
The Federal Aviation Administration (FAA) is planning a requirement for demolition services for the Runway #22 Localizer Shelter at LaGuardia Airport in Flushing, New York. This is a sources sought announcement to gauge contractor interest and capability. The scope of work includes testing for asbestos and lead paint, planning and design for abatement, removal of asbestos-containing materials, and demolition of the shelter structure. The demolition must comply with all applicable federal, state, and local regulations, including OSHA standards for asbestos and lead paint. The projected timeline includes a solicitation release between June 1 and July 31, 2026, with contract award expected between September 1 and October 31, 2026. The work is anticipated to start between January 2 and February 28, 2027, with a period of performance of sixty (60) calendar days.
| Title | Date Posted |
|---|---|
| Draft-Drawings-13pgs.pdf | Apr 21, 2026 12:00 PM |
| Draft-SOW-Specs-45pgs.pdf | Apr 21, 2026 12:00 PM |