Rehabilitate Runway 14-32 Touchdown Zone and Terminal Apron, Phase 2

The Gulfport-Biloxi Regional Airport Authority is seeking bids for the rehabilitation of Runway 14-32 Touchdown Zone and Terminal Apron, Phase 2.

Gulfport-Biloxi International Airport


General
Open
20405
Jun 23, 2026 02:00 PM
Jun 09, 2026 10:00 AM
Disadvantaged Business
Invitation for/to Bid (IFB/ITB)
Local
Contacts
Clay Williams
+12288635951
808 West Central Boulevard, Orlando, FL, USA

Dawn Malley
3036 Longfellow Drive, Bay St. Louis, MS, USA
Description

The Gulfport-Biloxi Regional Airport Authority (GBRAA) is soliciting bids for the rehabilitation of Runway 14-32 Touchdown Zone and Terminal Apron, Phase 2 at the Gulfport-Biloxi International Airport. This project involves full and partial depth concrete slab replacement, joint and crack sealing, spall repair, and the rehabilitation of pavement markings. The contract duration is 180 consecutive calendar days, with liquidated damages assessed for delays. A mandatory pre-bid conference is scheduled for June 9th, 2026, at 10:00 AM, followed by a site visit. Bidders must be qualified under Mississippi Law and possess a current Certificate of Responsibility. Contract documents are available for purchase via paper or digital copy at www.flygptplans.com. Bids are due by 2:00 PM local time on Tuesday, June 23rd, 2026, and must include a 5% bid bond. The successful bidder will be required to provide a 100% Performance Bond and a 100% Payment Bond within 10 days of award. This project is subject to Davis-Bacon Act requirements and other federal provisions including Buy American Preferences and Disadvantaged Business Enterprise participation.

Classification Codes
NAICS237310Highway, Street, and Bridge Construction
PSCZ2BDREPAIR OR ALTERATION OF AIRPORT RUNWAYS AND TAXIWAYS
Smart Codes
airport runway repairterminal apron reconstructionconcrete slab replacement
Timeline
Jun 09, 2026 12:00 PM-Pre-Bid Conference (required)
Jun 23, 2026 12:00 PM-Bid Opening