Elevator Maintenance, Inspections, and Repairs at Hungry Horse Dam

The Bureau of Reclamation is seeking capabilities statements from contractors capable of providing elevator maintenance, inspections, and repairs for three elevators at Hungry Horse Dam, Montana.

Bureau of Reclamation


General
Closed (past due)
140R1726Q0007
May 19, 2026 09:00 PM
May 11, 2026 05:30 PM
Sources Sought
Federal
Original Solicitation Links
Contact
Jeri Lynn Wahl
Grand Coulee, WA, USA
Description

The Bureau of Reclamation is conducting market research to identify contractors capable of performing elevator services, including inspection, maintenance, testing, and minor repairs for three elevators located at the Hungry Horse Field Office in Hungry Horse, Montana. Services must adhere to current industry standards such as ASME A17.1/CSA B44 and ASME A17.3, as well as Reclamation Safety & Health Standards and OSHA regulations. The scope includes detailed preventative maintenance tasks, annual inspections (Category 1 tests), and more comprehensive tests (Category 5 tests) for various elevator components like brakes, motors, and control systems. Minor repairs will be performed on a Time and Materials (T&M) basis, requiring contractor quotes for government review and approval prior to commencement. A critical requirement is an onsite response time of within 48 hours for elevator breakdowns, though contractors are invited to suggest a more reasonable timeframe if this is not feasible. The contract is anticipated to have a one-year base period with four one-year option periods, running from March 1, 2026, through February 28, 2031. Contractors must submit a site-specific Safety Plan and Job Hazard Analysis for government approval before commencing any work.

Classification Codes
NAICS811310Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
PSCJ039Maintenance, Repair and Rebuilding of Equipment: Materials Handling Equipment
Smart Codes
elevator maintenanceelevator inspectionelevator repair
Timeline
May 11, 2026 12:00 PM-Published Date
May 19, 2026 12:00 PM-Response Date
Jun 03, 2026 12:00 PM-Inactive Date
Documents
TitleDate Posted
B01_08_Draft_Sources_Sought_PWS_1.docxJan 07, 2026 12:00 PM
Sol_140R1726Q0007.pdfApr 10, 2026 12:00 PM
C05_01_FIST_2-10.pdfApr 10, 2026 12:00 PM
C05_01_Control_Bay_Elevator_Photos.pdfApr 10, 2026 12:00 PM
C05_01_FIST_1-1.pdfApr 10, 2026 12:00 PM
Sol_140R1726Q0007_Amd_0001.pdfApr 28, 2026 12:00 PM
C05_01_Block_14___19_Elevator_Photos.pdfApr 10, 2026 12:00 PM
C05_01_Pricing_Schedule_HH_Elevator_Revised.docxApr 10, 2026 12:00 PM
C05_01_FIST_5-14.pdfApr 10, 2026 12:00 PM
Sol_140R1726Q0007_Amd_0002.pdfMay 11, 2026 12:00 PM