Street Maintenance and Overlay Project

The City of Brookings, South Dakota is seeking bids for a street maintenance and overlay project that includes asphalt paving, cold milling, gravel base course, sidewalk installation, and utility work.

Brookings, SD


General
Closed (past due)
2026 - 016
May 05, 2026 01:30 PM
Apr 24, 2026 12:00 AM
Invitation for/to Bid (IFB/ITB)
Local
Original Solicitation Links
Contact
Bonnie Foster
+16056926629
520 3rd Street, Brookings, SD, USA
Description

The City of Brookings, South Dakota is soliciting bids for the 2026-08STI Street Maintenance and Overlay Project. This project involves a variety of civil engineering and construction tasks, including: * **Asphalt Pavement Work:** Cold milling of asphalt pavement (approximately 11,500 SY), placement of asphalt concrete (approximately 7,700 Tons), and related preparation such as existing base gravel preparation. * **Concrete Work:** Installation of PLC sidewalks (approximately 70,000 SF) and curb and gutter (approximately 2,500 LF). * **Base Course and Subgrade Work:** Placement of gravel base course (approximately 7,300 Tons), cement-stabilized subgrade preparation, and excavation. * **Utility Work:** Installation of PVC water main (approximately 1,100 LF of 8-12" pipe) and PVC sewer main (approximately 350 LF of 8" pipe), including service lines. * **Ancillary Work:** Includes traffic control, landscaping, seeding, and miscellaneous items. The project requires bidders to submit sealed bids by May 5, 2026. Bidders must accompany their proposals with a certified check or bid bond. Performance and payment bonds are required for the faithful performance of the contract.

Classification Codes
NAICS237310Highway, Street, and Bridge Construction
PSCZ1LBMAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
Smart Codes
street maintenanceasphalt overlayutility installation
Timeline
Apr 24, 2026 12:00 AM-Publication Date
May 05, 2026 01:30 PM-Closing Date