800 South Intersection Reconstruction
Springville City is seeking bids for the reconstruction of the 800 South and 800 East intersection, including the installation of a 5-way roundabout and associated utilities.
CITIES - Springville City
General
Open (open)
RFB 2026-08 800 South Intersection Reconstruction
May 27, 2026 08:00 PM
May 15, 2026 09:00 PM
Invitation for/to Bid (IFB/ITB)
Local
Original Solicitation Links
[
RFB 2026-08 800 South Intersection Reconstruction
]800 south intersection reconstruction
Description
This project involves the reconstruction of the existing 800 South and 800 East intersection, which will be transformed into a 5-way roundabout. The work includes the demolition and removal of existing asphalt, curb and gutter, sidewalk, fence, one fire hydrant, and one storm drain catch basin. New installations will include asphalt, curb and gutter, stamped concrete, ADA ramps, storm drain catch basins and manholes, fire hydrants, a PI lateral, a 2-inch electrical conduit, and a lighting junction box.
Classification Codes
NAICS237310Highway, Street, and Bridge Construction
PSCY222Construction of Highways, Roads, Streets, Bridges, and Railways (includes resurfacing)
Smart Codes
road reconstructionroundabout constructionutility installation
Timeline
May 15, 2026 12:00 PM-Open Date
May 21, 2026 12:00 PM-Pre-Bid Meeting (required)
Springville City offices
May 26, 2026 12:00 PM-Questions Due Date
May 27, 2026 12:00 PM-Close Date