Gym Floor Replacement - Seward High School
Kenai Peninsula Borough
ITB26-022 GYM FLOOR REPLACEMENT
]The Kenai Peninsula Borough hereby invites qualified firms to submit a firm price for acceptance by the Borough for ITB26-022 Gym Floor Replacement - Seward High School. The project consists of the following: Provide all labor and materials to demo and replace an existing gym floor.
The Kenai Peninsula Borough is soliciting bids for the complete demolition and replacement of the existing gym floor at Seward High School. This project includes providing all necessary labor and materials to remove the current hardwood flooring, prepare the underlying concrete slab, and install a new maple hardwood athletic floor. The scope of work also involves the relocation and reinstallation of the existing gymnasium seating (bleachers) as needed for the flooring installation. Key specifications include adherence to Maple Flooring Manufacturers Association (MFMA) standards, use of specific materials such as Robbins Sportwood adhesive and 15/32" thick Exposure 1 APA Rated Sheathing for subflooring, and MFMA graded Northern Hard Maple for the flooring itself. The installation requires specific environmental conditions to be maintained, including temperature and humidity ranges, and proper protection of the finished floor during the remainder of the construction period. A pre-bid conference is scheduled for April 16, 2026, at 3:00 PM at Seward High School, though attendance is strongly recommended rather than mandatory. Bids are due by May 6, 2026, no later than 2:00 PM and can be submitted electronically via BidExpress.com or in hard copy to the Kenai Peninsula Borough Purchasing and Contracting Department.