Citywide Wayfinding Signage Manufacturing and Installation
City of Commerce City
IFB-PW-25-042
]citywide wayfinding
The City of Commerce City is seeking a qualified contractor to manufacture and install signage at over 100 locations within the city as described in the Citywide Wayfinding design documents. The project involves the creation and placement of various types of signage, including gateway identification, vehicular directional signs, park directional signs, trail directional signs, pedestrian directional signs, and interpretive kiosks. The scope of work includes the fabrication of custom signage components, adherence to specific graphic standards, typography, and color specifications, as detailed in the provided design intent drawings and technical specifications. The contractor will be responsible for all aspects of installation, including site preparation, excavation, concrete footers, and ensuring compliance with traffic control plans and safety regulations. The project also involves the removal of existing signage and coordination with utility companies. Key requirements include adherence to MUTCD standards, ADA compliance, and specific material and finish specifications for durability and aesthetics. The contractor must also provide detailed shop drawings, structural engineering calculations, and a comprehensive waste management plan.
| Title | Date Posted |
|---|---|
| Q & A Document 1.pdf | Apr 24, 2026 01:29 PM |
| Attachment H.pdf | Apr 24, 2026 01:30 PM |
| Attachment H.pdf | Apr 24, 2026 01:30 PM |
| Att F C3 Special Conditions.docx | Apr 16, 2026 10:03 PM |
| Q & A Document 1.pdf | Apr 24, 2026 01:29 PM |
| Att G Merje Plans and Specifications.pdf | Apr 16, 2026 10:04 PM |
| IFB Document.pdf | Apr 16, 2026 10:03 PM |
| Att B & C Bonds.pdf | Apr 16, 2026 10:03 PM |
| Att E C3 General Conditions.pdf | Apr 16, 2026 10:03 PM |
| Att A Draft Contract.pdf | Apr 16, 2026 10:03 PM |
| Att D Equipment Declaration.docx | Apr 16, 2026 10:03 PM |
| Q & A Document 2.pdf | May 04, 2026 01:16 PM |
| Q & A Document 3.pdf | May 04, 2026 08:55 PM |
| Q & A Document 2.pdf | May 04, 2026 01:16 PM |
| Q & A Document 4.pdf | May 11, 2026 10:32 PM |
| Attachment I.pdf | May 04, 2026 01:24 PM |
| Q & A Document 4.pdf | May 11, 2026 10:32 PM |
| Q & A Document 3.pdf | May 04, 2026 08:55 PM |
| Attachment I.pdf | May 04, 2026 01:24 PM |