Heat Exchanger Replacement and Boiler System Repairs
INDIAN HEALTH SERVICE
75H70326S00002
]scattered sites well drilling project ca22-d46 / edo-295-d46
75H70126Q00017
]colton heuker (cow)
75H70126C00015
]kyle health center ashrae 170 upgrades and roof replacement
75H70126R00022
]belcourt heat exchanger replacement & boiler system repairs
This project involves the replacement of two domestic water heating systems, replacement of boiler system isolation valves, replacement of boiler pump's triple duty valves, pressure gauges, and thermometers, laser alignment and grouting of pumps, replacement of gate valves and site glasses on boiler expansion tanks, replacement of boiler and breaching flue gaskets, and the upgrade and replacement of controls on the boiler room make-up air unit and exhaust fan. The new hot water heating systems will be designed and sized by a mechanical engineer licensed in North Dakota. The project is located at the Quentin N. Burdick Memorial Health Facility in Belcourt, North Dakota, with a period of performance of 180 calendar days from the notice to proceed. The estimated magnitude of this construction project is between $500,000 and $1,000,000.