Eastham Phase 1 Collection System - Contract 3

The State of Massachusetts is seeking a contractor for Eastham Phase 1 Collection System - Contract 3, which involves the installation of various types of sewer piping, manholes, and services.

Town of Eastham


General
Open (open)
BD-21-1490-TOE01-TOE01-129983
Jun 17, 2026 11:00 AM
May 28, 2026 10:33 AM
Invitation for/to Bid (IFB/ITB)
State
Original Solicitation Links
Description

This Invitation for Bid (IFB) concerns Contract 3 of the Eastham Phase 1 Collection System project. The scope of work includes the installation of approximately 11,000 linear feet of 8-inch PVC gravity sewer piping, manholes, and services. Additionally, the project requires the installation of approximately 1,300 linear feet of 4-inch PVC pressurized sewer force main piping, valves, and manholes. The contract also includes the installation of approximately 6,500 linear feet of 2-inch PVC low pressure sewer main piping.

Classification Codes
NAICS237110Water and Sewer Line and Related Structures Construction
PSCY244Construction of Sewage and Waste Facilities
Smart Codes
pvc gravity sewer pipingpvc pressurized sewer force main pipingpvc low pressure sewer main piping