Sunset and Tanglewood Well Project

PlanetBids is seeking contractors to drill and install production wells at the Tanglewood and Sunset well sites.

South Tahoe Public Utility District Engineering


General
Open
Jun 08, 2026 09:00 PM
May 08, 2026 12:03 AM
Request for Proposal (RFP)
Private
Original Solicitation Links
Contact
Starlet Glaze
sglaze@stpud.dst.ca.us
+15305436205
1275 Meadow Crest Drive, South Lake Tahoe, CA, USA
Description

This project involves drilling and installing production wells at the Tanglewood and Sunset well sites. The scope of work includes site preparation, installation of temporary perimeter sound walls, reverse rotary drilling, lithologic sampling, geophysical logging, installation of casing and screen, installation of gravel pack and intermediate seals, installation of sanitary seal, well development, pump testing, and installation of surface completion. A hard copy original Bid Bond (or other acceptable form of bid security) MUST be delivered to the District in advance of the Bid deadline.

Classification Codes
NAICS213111Drilling Oil and Gas Wells
PSCF015Well Drilling/Exploratory Services
Smart Codes
well drillingsite preparationgeophysical logging
Timeline
May 08, 2026 12:03 AM-Bid Posted Date
May 30, 2026 12:00 AM-Q&A Deadline
Jun 08, 2026 09:00 PM-Bid Due Date