Levee Stabilization and Repair

The United States Section of the International Boundary and Water Commission is seeking a contractor to stabilize the existing levee in Brownsville, Texas, including soil mix columns, aggregate piers, concrete block mattress revetment, rock riprap, and gatewell structure repair.

INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO


General
Closed (past_due)
191BWC25R0010
Jul 14, 2025 08:00 PM
Jul 03, 2025 07:21 PM
Original Solicitation Links
Description

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation for the purpose of stabilizing the existing levee to ensure that an existing slope failure cannot activate. The major construction efforts include the installation of soil mix columns, installation of aggregate piers (stone columns), installation of an articulated concrete block mattress revetment system, installation of rock riprap and geotextile, excavation, replacing, and compacting levee embankment soils, placing and compacting soil materials, repair of an existing gatewell structure, and reconstruction/resurfacing of the existing access road. The site has limited ingress and egress from River Levee Road off of West University Blvd in Brownsville and is located directly adjacent to the Gateway International Bridge within the floodway of the Rio Grande. The work is located in Brownsville, Texas. All work shall be completed within one thousand and thirty (1,030) calendar days after the Notice to Proceed.

Timeline
Mar 06, 2025 12:00 PM-Published Date
Documents
TitleDate Posted
191BWC25R0010 Brownsville Specs 20250115.pdfMay 08, 2025 12:00 PM
00_31_32-1_3_C_3_20070928 Geotech Donna Pump to Brownsville SandB.pdfMay 08, 2025 12:00 PM
00_31_43-1_5_A_20230906 USACE 404 SWG-2023-00309 NWP.pdfMay 08, 2025 12:00 PM
191BWC15R0010 Past Performance Questionnaire.pdfMay 08, 2025 12:00 PM
IBWC_Form_245C_Performance_of_Work_Contractor.pdf(archived)May 08, 2025 12:00 PM
WD_TX_20250003-01-03-2025.pdfMay 08, 2025 12:00 PM
Client_Authorization_Letter.docxMay 08, 2025 12:00 PM
00_31_32-1_3_A_1_m_20200716 Inclinometer Readings.pdfMay 08, 2025 12:00 PM
00_31_32-1_3_A_1_l_20200403 Inclinometer Readings.pdf(archived)May 08, 2025 12:00 PM
00_31_32-1_3_A_1_j_20170621 Inclinometer Readings.pdfMay 08, 2025 12:00 PM
00_31_32-1_3_A_1_f_20170215 Inclinometer Readings.pdfMay 08, 2025 12:00 PM
00_31_32-1_3_A_1_h_20170412 Inclinometer Readings.pdfMay 08, 2025 12:00 PM
00_31_32-1_3_A_1_e_20170105 Inclinometer Readings.pdfMay 08, 2025 12:00 PM
00_31_32-1_3_A_1_g_20170320 Inclinometer Readings.pdfMay 08, 2025 12:00 PM
00_31_19-1_4_A_2_201205 Upper Brownsville Levee Design Report TT REDACTED.pdfMay 08, 2025 12:00 PM
00_31_19-1_4_C_04783-000-00 RGBPP River Revetment at Fort Brown 1950-04-04.pdfMay 08, 2025 12:00 PM
00_31_32-1_3_A_1_c_20161031 Inclinometer Readings.pdfMay 08, 2025 12:00 PM
00_31_32-1_3_A_1_a_20160829 Inclinometer Readings.pdfMay 08, 2025 12:00 PM
00_31_32-1_3_A_1_b_20160926 Inclinometer Readings.pdfMay 08, 2025 12:00 PM
00_31_32-1_3_A_1_d_20161118 Inclinometer Readings.pdfMay 08, 2025 12:00 PM
Attachment_Docs_List.pdfMay 08, 2025 12:00 PM
USIBWC Amendment 2- D5-19-23.pdfMay 19, 2025 12:00 PM
00_31_19-1_4_B_IBM13C0001 Record Drawings Excerpts- REDUCED.pdfMay 09, 2025 12:00 PM
USIBWC Amendment 3- D5-24-25.pdfMay 24, 2025 12:00 PM
USIBWC Amendment 1- D5-13-25.pdfMay 13, 2025 12:00 PM
Report of Subsurface Exploration Intl Bridge PSI (2).pdfMay 13, 2025 12:00 PM
Reduced Size_ Geotech Donna Pump to Brownsville SandB.pdfMay 13, 2025 12:00 PM
Report of Subsurface Exploration Truck Lane Improvements Gateway Inl Bridge.pdfMay 13, 2025 12:00 PM
Report of Subsurface Exploration Intl Bridge PSI.pdfMay 13, 2025 12:00 PM
SOLICITATION Upper Brownsville Levee_E_191BWC25R0010_.pdfMay 13, 2025 12:00 PM
00_31_32-1_3_A_1_k_20170718 Inclinometer Readings.pdf(archived)May 08, 2025 12:00 PM
SF-30 Amendment 005_.pdfJul 03, 2025 12:00 PM
191BWC25R0010_Brownsville Specs_ 20250702_.pdfJul 03, 2025 12:00 PM
SF-30 Amendment 003.pdfJun 26, 2025 12:00 PM
191BWC25R0010_Brownsville_Drawings_20250617.pdf(archived)Jun 26, 2025 12:00 PM
SF-30 Amendment 004.pdfJul 01, 2025 12:00 PM
Section L Source Selection Criteria _4.pdfJul 01, 2025 12:00 PM
REDUCED Geotech Donna Pump to Brownsville Raba Kistner.pdf(archived)May 14, 2025 12:00 PM
SF-30 Amendment 002.pdfJun 10, 2025 12:00 PM
SF-30 Amendment 001.pdfJun 02, 2025 12:00 PM
00_31_32-1_3_C_4_20070928 Geotech Donna Pump to Brownsville Boreholes SandB.pdf(archived)May 08, 2025 12:00 PM
00_31_32-1_3_A_1_i_20170519 Inclinometer Readings.pdfMay 08, 2025 12:00 PM