Carey Avenue 36-Inch Water Main Corrosion Protection and Testing

The State of Nevada is seeking corrosion protection and testing services for a 36-inch water main along Carey Avenue, with an estimated cost between $1.1M and $1.3M.

About Us City of North Las Vegas


General
Open (issued)
1778
Jun 04, 2026 06:30 PM
May 08, 2026 12:32 AM
$1,300,000.00
Invitation for/to Bid (IFB/ITB)
State
Contact
Allan Fajardo, P.E., PTOE
North Las Vegas, NV, USA
Description

This project involves installing 29 test stations along Carey Avenue on an existing 36-inch water line to verify the continuity of the corrosion protection system. Additionally, work will be performed at three other sites: Rectifier Site 1 (Central Reservoir), Rectifier Site 3 (P2 Pump Station), and Rectifier Site 4 (P2B Reservoir). The project is expected to be completed within 365 consecutive calendar days from the date specified in the Notice to Proceed, which includes the resolution of all punch list items, final cleanup, and demobilization. The estimated construction cost for this project ranges from $1.1 million to $1.3 million.

Classification Codes
NAICS237110Water and Sewer Line and Related Structures Construction
PSCH147Quality Control Services: Pipe, Tubing, Hose, and Fittings
Smart Codes
water main installationcorrosion protection systemspipeline testing services
Timeline
May 08, 2026 12:00 PM-Close Date
May 22, 2026 12:00 PM-Question Cut-off Date
Jun 04, 2026 12:00 PM-Issue Date
Jun 04, 2026 12:00 PM-Submit Bids By