Marana El Rio Disc Golf Course and Parking Lot Construction

The Town of Marana is seeking bids for the construction of the Marana El Rio Disc Golf Course and a parking lot at the El Rio Recreation Area.

Town of Marana (AZ)


General
Closed (past due)
2026-005
May 19, 2026 10:00 PM
Apr 15, 2026 04:00 PM
Invitation for/to Bid (IFB/ITB)
Local
Contact
Rudy Torres
+15203821983
11555 West Civic Center Drive, Marana, AZ, USA
Description

The Town of Marana is soliciting bids for the construction of the Marana El Rio Disc Golf Course (Project No. PK031) and the El Rio Recreation Area Parking Lot (Project No. PK032). The disc golf course project includes the construction of an 18-hole course with concrete tee boxes, native soil paths, an entry plaza with a monument sign, installation of baskets and signage, and a new irrigation system with native re-vegetation. The parking lot project involves the placement of asphalt millings, parking bumpers, new concrete flatwork for ADA parking and pathways, and pavement markings. Both projects are located within the Town of Marana's jurisdictional limits. The disc golf course is situated on Pima County Flood Control District property, while the parking lot is on Town of Marana property. The contract time for all construction work is 120 calendar days from the Notice to Proceed. The warranty period for the project is 730 consecutive calendar days.

Classification Codes
NAICS237990Other Heavy and Civil Engineering Construction
PSCY1LZCONSTRUCTION OF PARKING FACILITIES
Smart Codes
disc golf course constructionparking lot constructionirrigation system installation
Timeline
Apr 16, 2026 12:00 PM-Advertisement Dates
Apr 23, 2026 12:00 PM-Advertisement Dates
Apr 30, 2026 12:00 PM-Pre-Bid Conference (optional)
Marana Operation Center
May 06, 2026 12:00 PM-Final Date for Inquiries
May 14, 2026 12:00 PM-Bid Date
May 19, 2026 12:00 PM-Award of Contract
Jun 03, 2026 12:00 PM-Contractor Submits Bonds, Insurance, Signed Contract
Jun 04, 2026 12:00 PM-Town Executes Contract
Jun 11, 2026 12:00 PM-Pre-Construction Meeting
Jun 11, 2026 12:00 PM-Notice to Proceed Authorization Date
Jun 20, 2026 12:00 PM-Start Construction
Dec 01, 2026 12:00 PM-Project Completion