Design-Build Construction of Single-Family Homes at Camp 4

The Santa Ynez Band of Chumash Indians is seeking a design-build contractor for the construction of eight single-family homes on their reservation in Santa Ynez, California.

Santa Ynez Band of Chumash Indians


General
Open (accepting bids)
3029
Jun 12, 2026 12:00 PM
OtherOther
Request for Proposal (RFP)
Local
Original Solicitation Links
Contacts
Kelly Boles
+19712124222
100 Via Juana Lane, Santa Ynez, CA, USA

Yvette Yazzie
27368 Via Industria, Temecula, CA, USA
Description

The Santa Ynez Band of Chumash Indians (SYBCI) is issuing a Request for Proposal (RFP) for design-build services to construct eight new single-family homes on the Santa Ynez Indian Reservation in Santa Barbara County, California. The project includes seven three-bedroom, two-bathroom homes (minimum 1,550 sq. ft. each with a 2-car garage) and one five-bedroom, two-bathroom home (minimum 1,850 sq. ft. with a 2-car garage). The homes will be funded by HUD grants: FY2021 Indian Housing Block Grant (IHBG), FY2022 and FY2024 Indian Community Development Block Grants (ICDBG). The selected contractor will be responsible for all aspects of project delivery, from design and engineering to construction, permitting, and closeout. Key project goals include quality and durability, energy efficiency and sustainability (meeting or exceeding Energy Star standards), code compliance and safety (including Wildland Urban Interface requirements), cultural sensitivity, and adherence to schedule and budget. The scope of services encompasses pre-construction, design, permitting, procurement, construction, and warranty phases. All homes will be single-story, wood-framed construction on permanent foundations, meeting SYBCI requirements and applicable codes.

Classification Codes
NAICS236115New Single-Family Housing Construction (except For-Sale Builders)
PSCY161Construction of Family Housing Facilities
Smart Codes
single-family home constructiondesign-build servicestribal housing development
Timeline
May 08, 2026 12:00 PM-Issue RFP
May 11, 2026 12:00 PM-Pre-Proposal Meeting/Site Tour
May 29, 2026 12:00 PM-Pre-Proposal Meeting/Site Tour (optional)
Jun 02, 2026 12:00 PM-Closing Date for RFIs
Jun 05, 2026 12:00 PM-Last RFI Response Issued
Jun 12, 2026 12:00 PM-Proposals Due
Jun 19, 2026 12:00 PM-Notification of Short-Listed Respondents
Jun 22, 2026 12:00 PM-Interviews
Jun 24, 2026 12:00 PM-Interviews
Jun 26, 2026 12:00 PM-Letter of Intent / Notice to Proceed
Jul 02, 2026 12:00 PM-Contract Executed
Sep 18, 2026 12:00 PM-Estimated Construction Start
Aug 27, 2027 12:00 PM-Estimated Substantial Completion