1MG SCLA Reclaimed Water Reservoir 2
City of Victorville Engineering
MS26-111
]1mg scla reclaimed water reservoir 2
The City of Victorville is soliciting bids for the design and construction of a new 1-million-gallon prestressed concrete circular reclaimed water reservoir at the Southern California Logistics Airport (SCLA). This project will replace an existing, open-air pond that experiences water quality issues and evaporation losses. The scope of work includes the design and construction of the reservoir, approximately 350 linear feet of onsite piping, and a new pump station with prefabricated steel building, pumps, motors, controls, and electrical systems. Additionally, the project involves the extension of approximately 1,380 linear feet of potable water main as a backup supply and the decommissioning and removal of the existing pond and associated infrastructure. Environmental tasks, including the handling and disposal of pesticide-contaminated soil, are also included.
| Title | Date Posted |
|---|---|
| H - Updated DASForm140-142 6.2024 | Apr 03, 2026 12:51 PM |
| F - Attachment F - Mitigation Monitoring and Reporting Program | Mar 19, 2026 04:14 PM |
| 1MG_SCLA_Reclaimed_Water_Reservoir_2.pdf | Apr 08, 2026 12:00 AM |
| D - Attachment D - Bid Schedule | Mar 19, 2026 04:14 PM |
| B - Attachment B - Section A_Special Provisions | Apr 07, 2026 02:22 PM |
| E - Attachment E - Final Initial Study & Mitigated Negative Declaration | Mar 20, 2026 02:50 PM |
| J - Guaranty Form | Apr 03, 2026 02:28 PM |
| I - Performance and Payments Bonds | Apr 06, 2026 04:01 PM |
| K - GREENBOOK CONSTRUCTION AGREEMENT | Apr 06, 2026 05:36 PM |
| G - Attachment G - Pesticide Contaminated Soil Mitigation Measures | Mar 19, 2026 04:14 PM |
| C - Attachment C - Technical Specifications for 1MG SCLA Reclaimed Water Reservoir 2 | Mar 19, 2026 04:14 PM |
| #1 PRE-BID MEETING SIGN-IN | May 04, 2026 01:16 PM |
| #1 PRE-BID MEETING AGENDA | May 04, 2026 01:16 PM |