Basler Exciter Control System Retrofit and Prime Power/Siemens EX-1 System Replacement for Hydropower Sites
DEPT OF THE ARMY
W9127826RA071
]sam?sas?sac basler ecs 2100 exciter retrofit
The U.S. Army Corps of Engineers (USACE) intends to upgrade and retrofit Basler ECS-2100 excitation control systems and replace Prime Power/Siemens EX-1 excitation systems at four hydropower sites located within the Savannah, Mobile, and Charleston Districts. This comprehensive project encompasses engineering, design, manufacturing, factory testing, delivery, demolition, installation, integration, commissioning, training, and documentation. The primary objectives are to replace obsolete digital control hardware, enhance reliability, improve maintainability, and boost diagnostic capabilities, ultimately standardizing excitation technology across multiple powerhouses. Detailed information regarding the specific scope of work, technical requirements, and submission instructions can be found in the attached Sources Sought document.