Supply and Install Metal Storage Building at Bolivar Mitigation Area
DEPT OF THE ARMY
The U.S. Army Corps of Engineers, Vicksburg District, is soliciting quotes for the supply and installation of a pre-engineered metal storage building at the Bolivar Mitigation Area. The scope of work includes laying the concrete foundation, purchasing, delivering, and installing the building, and providing a commercial warranty. The building will be a 60-ft x 60-ft steel structure with a 14-ft eave height, a 4:12 roof pitch, and tan-colored walls and trim. It will feature one 12-ft (H) x 16-ft (W) roll-up steel door on each end wall and one 3/0 x 7/0 steel walk-in door on one sidewall. The structure, footings, and concrete slab will be designed and stamped by a licensed professional engineer and rated for extreme wind and snow loads. All work must be completed within 90 days of award.
| Title | Date Posted |
|---|---|
| B.08. Combined Syn_Sol_26QA027.pdf | May 21, 2026 12:00 PM |