Buffalo Gap Campground Water Line Repair

The USDA Forest Service is seeking repairs to the water line at Buffalo Gap Campground near Medora, North Dakota, involving the replacement of three curb stop valves.

Forest Service


General
Closed (past due)
1240LU26Q0071
May 12, 2026 09:00 PM
May 08, 2026 08:10 PM
Small Business (SB)
Request for Quote/Qualifications (RFQ)
Federal
Original Solicitation Links
Contact
John Curry
+16056739216
Description

This project involves the repair of water lines at the Buffalo Gap Campground, located approximately 7 miles west of Medora, North Dakota. The work includes the removal and replacement of three 1-inch curb stop valves on the main water line. Two new valves will be installed to isolate flow to the flush toilets and shower house, respectively, while the third will isolate the hydrant at the end of the parking loop. The scope of work also includes removing historical waterline vent features and installing adjustable standpipes with pentagon bolt caps. Excavation will be performed to expose the main line and components, with adherence to OSHA excavation standards and proper water management. The line will be pressure tested for leaks before backfilling, which will involve specific bedding and compaction procedures. Materials specified include curb stops conforming to AWWA C800 standards and cast iron extension type curb boxes. Existing vent standpipes, curb stops, and associated mainline PE pipe designated for removal will be disposed of in accordance with regulations. The magnitude of this project is under $25,000, and it is anticipated to be a firm-fixed-price contract.

Classification Codes
NAICS237110Water and Sewer Line and Related Structures Construction
PSCZ2NEREPAIR OR ALTERATION OF WATER SUPPLY FACILITIES
Smart Codes
water line repaircurb stop valvecampground maintenance
Timeline
Apr 28, 2026 12:00 PM-Published Date
May 12, 2026 12:00 PM-Offers Due Date
May 15, 2026 12:00 PM-Period of Performance Start Date
May 27, 2026 12:00 PM-Inactive Date
Jun 15, 2026 12:00 PM-Anticipated Delivery Date
Jun 15, 2026 12:00 PM-Period of Performance End Date