Eakin Student Recreation Center - Partial Roof Replacement
East Carolina University is seeking a contractor for the partial roof replacement of the Eakin Student Recreation Center in Greenville, NC.
State of North Carolina through East Carolina University, Facilities Engineering and Architectural Services
General
Open
24-29075-01A
Jun 02, 2026 06:00 PM
May 01, 2026 12:00 PM
Invitation for/to Bid (IFB/ITB)
State
Original Solicitation Links
[
24-29075-01A
]https://www.ncnotices.comContact
1001 East Fourth Street, Greenville, NC, USA
Description
East Carolina University, Facilities Engineering and Architectural Services, is soliciting sealed proposals for the Eakin Student Recreation Center - Partial Roof Replacement project located at 128 E 7th St, Greenville, NC 27858. The scope of work includes the removal of the existing standing seam metal roof, board insulation, and five translucent Kalwall skylights. The project also involves the installation of new insulation, air/vapor/water barrier membranes, standing seam metal roofing, gutters, downspouts, and new translucent skylights as a complete replacement assembly over existing active court floors. Bids will be received for a single prime contract on a lump sum basis.
Classification Codes
NAICS238160Roofing Contractors
PSC5650Roofing and Siding Materials
Smart Codes
roof replacementmetal roofing installationskylight installation
Timeline
May 05, 2026 12:00 PM-Pre-Bid Meeting (required)
ESRC Classroom
Jun 02, 2026 12:00 PM-Proposal Due Date