Evelyn June Senior Living Construction

Bacar Constructors is seeking bids for the construction of the Evelyn June Senior Living facility, a three-story, 54-unit apartment building with associated site and infrastructure improvements in Smyrna, Tennessee.

Bacar Constructors


General
Open (pending)
1835
Request for Proposal (RFP)
Private
Original Solicitation Links
Description

This project involves the new construction of a three-story, multi-family (R-2) apartment building with 54 dwelling units and associated accessory resident amenity spaces. The project also includes site and infrastructure improvements. The construction will be Type VA (Protected, Combustible) and will be fully sprinklered with a fire alarm system. The building will have a total floor area of approximately 69,000 square feet. The project is located at 1577 Rock Springs Road in Smyrna, Tennessee. The owner is Gateway Properties Of Middle TN, LLC.

Classification Codes
NAICS236116New Multifamily Housing Construction (except For-Sale Builders)
PSCC116Residential Buildings
Smart Codes
residential constructionmulti-family housingsenior living facility
Documents
Title
032 S004 - SPECIAL INSPECTIONS
061 S511 - WOOD FRAMING DETAILS
043 S221.1 - PARTIAL SECOND FLOOR FRAMING PLAN
040 S220.2 - PARITAL FOUNDATION SHEAR WALL PLAN
046 S221.4 - PARTIAL SECOND FLOOR SHEAR WALL PLAN
049 S222.3 - PARTIAL THIRD FLOOR FRAMING PLAN
048 S222.2 - PARTIAL THIRD FLOOR SHEAR WALL PLAN
064 S522 - WOOD ROOF DETAILS
047 S222.1 - PARTIAL THIRD FLOOR FRAMING PLAN
067 A001 - GENERAL CONVENTIONS AND REPRESENTATIONS
029 S001 - STRUCTURAL GENERAL NOTES
065 S531 - WOOD ROOF FRAMING PROFILES
057 S411 - MASONRY DETAILS
036 S212 - COMPOSITE SECOND FLOOR FRAMING PLAN
121 A701 - FINISHES LEGEND
056 S401 - MASONRY TYPICAL DETAILS
028 COVER
063 S521 - WOOD ROOF DETAILS
037 S213 - COMPOSITE THIRD FLOOR FRAMING PLAN
068 A002 - GENERAL CONVENTIONS AND REPRESENTATIONS
071 A010 - PROJECT CODE SUMMARY
042 S220.4 - PARITAL FOUNDATION SHEAR WALL PLAN
045 S221.3 - PARTIAL SECOND FLOOR FRAMING PLAN
099 A243 - FLOOR PLAN DETAILS
033 S005 - SPECIAL INSPECTIONS
030 S002 - STRUCTURAL GENERAL NOTES
058 S501 - TYPICAL WOOD DETAILS
059 S502 - TYPICAL WOOD DETAILS
031 S003 - STRUCTURAL GENERAL NOTES
044 S221.2 - PARTIAL SECOND FLOOR SHEAR WALL PLAN
039 S220.1 - PARTIAL FOUNDATION PLAN
066 A000 - GENERAL PROJECTS NOTES
069 A003 - MINIMUM ACCESSIBILITY STANDARDS
062 S512 - WOOD FRAMING DETAILS
053 S301 - CONCRETE TYPICAL DETAILS
050 S222.4 - PARTIAL THIRD FLOOR SHEAR WALL PLAN
035 S211 - COMPOSITE FOUNDATION PLAN
110 A501 - WINDOWS AND STOREFRONTS
070 A004 - MINIMUM ACCESSIBILITY STANDARDS
060 S503 - SHEAR WALLS DETAILS
120 A700 - FINISHES SCHEDULES AND NOTES
079 A052 - TYPICAL RATED PARTITIONS
090 A222.A - PARTIAL THIRD FLOOR PLAN
131 M1.3B - THIRD FLOOR MECHANICAL NEW WORK AREA B
100 A300 - REFLECTED CEILING PLAN SCHEDULES AND NOTES
078 A031 - PARTITION ASSEMBLIES
118 A631 - WALL SECTION DETAILS
133 M1.4B - ROOF FLOOR MECHANICAL NEW WORK AREA B
098 A242 - FLOOR PLAN DETAILS
126 M1.1A - FIRST FLOOR MECHANICAL NEW WORK AREA A
108 A412 - INTERIOR ELEVATIONS
096 A234 - ENLARGED FLOOR PLANS
115 A621 - WALL SECTIONS
127 M1.1B - FIRST FLOOR MECHANICAL NEW WORK AREA B
086 A220.A - PARTIAL FIRST FLOOR PLAN
041 S220.3 - PARTIAL FOUNDATION PLAN
109 A500 - OPENINGS ELEVATIONS AND SCHEDULES
107 A411 - INTERIOR ELEVATIONS
097 A241 - FLOOR PLAN DETAILS
128 M1.2A - SECOND FLOOR MECHANICAL NEW WORK AREA A
111 A502 - HEAD, JAMB, AND SILL DETAILS
119 A632 - WALL SECTION DETAILS
083 A213 - COMPOSITE THIRD FLOOR PLAN
084 A214 - COMPOSITE ATTIC PLAN
082 A212 - COMPOSITE SECOND FLOOR PLAN
091 A222.B - PARTIAL THIRD FLOOR PLAN
055 S312 - FOUNDATION DETAILS
132 M1.4A - ROOF FLOOR MECHANICAL NEW WORK AREA A
088 A221.A - PARTIAL SECOND FLOOR PLAN
125 A801 - COMCHECK
114 A513 - EXTERIOR ELEVATIONS
076 A022 - SECOND FLOOR LIFE SAFETY AND ACCESSIBILITY PLANS
095 A233 - ENLARGED UNIT FLOOR PLANS
081 A211 - COMPOSITE FIRST FLOOR PLAN
054 S311 - FOUNDATION DETAILS
150 P2.7 - THIRD FLOOR PLAN SANITARY WASTE AREA B
144 P2.1A - FIRST FLOOR PLAN SANITARY WASTE AREA A
148 P2.5A - THIRD FLOOR PLAN SANITARY WASTE AREA A
149 P2.6B - THIRD FLOOR PLAN SANITARY WASTE AREA B
087 A220.B - PARTIAL FIRST FLOOR PLAN
074 A013 - DWELLING UNIT TYPE PLANS
145 P2.2B - FIRST FLOOR PLAN SANITARY WASTE AREA B
089 A221.B - PARTIAL SECOND FLOOR PLAN
130 M1.3A - THIRD FLOOR MECHANICAL NEW WORK AREA A
129 M1.2B - SECOND FLOOR MECHANICAL NEW WORK AREA B
152 P3.2 - SANITARY WASTE & VENT RISER DIAGRAM - A2
092 A223 - GARDEN MAINTENANCE BUILDING
153 P3.3 - SANITARY WASTE & VENT RISER DIAGRAM - UNITS
075 A021 - FIRST FLOOR LIFE SAFETY AND ACCESSIBILITY PLANS
077 A023 - THIRD FLOOR LIFE SAFETY AND ACCESSIBILITY PLANS
146 P2.3A - SECOND FLOOR PLAN SANITARY WASTE AREA A
093 A231 - ENLARGED UNIT FLOOR PLANS
139 P1.2B - FIRST FLOOR PLAN PLUMBING AREA B
135 M2.2 - MECHANICAL ENLARGED FLOOR PLANS
142 P1.5A - THIRD FLOOR PLAN PLUMBING AREA A
124 A714 - TYPICAL UNIT FINISHES PLANS
151 P3.1 - SANITARY WASTE & VENT RISER DIAGRAM - A1
138 P1.1A - FIRST FLOOR PLAN PLUMBING AREA A
147 P2.4B - SECOND FLOOR PLAN SANITARY WASTE AREA B
140 P1.3A - SECOND FLOOR PLAN PLUMBING AREA A
073 A012 - DWELLING UNIT TYPE PLANS
141 P1.4B - SECOND FLOOR PLAN PLUMBING AREA B
169 E2.8 - ROOF FLOOR PLAN PART _B_ POWER
156 E1.1 - FIRST FLOOR PLAN PART _A_ LIGHTING
103 A322.A - J SECOND FLOOR REFLECTED CEILING PLAN
157 E1.2 - FIRST FLOOR PLAN PART _B_ LIGHTING
143 P1.6B - THIRD FLOOR PLAN PLUMBING AREA B
094 A232 - ENLARGED UNIT FLOOR PLANS
134 M2.1 - MECHANICAL ENLARGED FLOOR PLANS
168 E2.7 - ROOF FLOOR PLAN PART _A_ POWER
179 FP.04 - BUILDING SECTIONS FIRE PROTECTION
101 A321.A - FIRST FLOOR REFLECTED CEILING PLAN
105 A323.A - THIRD FLOOR REFLECTED CEILING PLAN
116 A622 - WALL SECTIONS
158 E1.3 - SECOND FLOOR PLAN PART _A_ LIGHTING
174 E4.3 - SERVICE RISERS
166 E2.5 - THIRD FLOOR PLAN PART _A_ POWER
159 E1.4 - SECOND FLOOR PLAN PART _B_ LIGHTING
164 E2.3 - SECOND FLOOR PLAN PART _A_ POWER
160 E1.5 - THIRD FLOOR PLAN PART _A_ LIGHTING
104 A322.B - SECOND FLOOR REFLECTED CEILING PLAN
106 A323.B - THIRD FLOOR REFLECTED CEILING PLAN
167 E2.6 - THIRD FLOOR PLAN PART _B_ POWER
161 E1.6 - THIRD FLOOR PLAN PART _B_ LIGHTING
162 E2.1 - FIRST FLOOR PLAN PART _A_ POWER
165 E2.4 - SECOND FLOOR PLAN PART _B_ POWER
102 A321.B - FIRST FLOOR REFLECTED CEILING PLAN
163 E2.2 - FIRST FLOOR PLAN PART _B_ POWER
171 E3.2 - ENLARGED FLOOR PLANS ELECTRICAL
123 A712 - SECOND_THIRD FLOOR FINISHES PLAN
170 E3.1 - ENLARGED FLOOR PLANS ELECTRICAL
173 E4.2 - PANEL SCHEDULES
182 FP.07 - SECOND FLOOR PLAN FIRE PROTECTION AREA A
122 A711 - FIRST FLOOR FINISHES PLAN
112 A511 - EXTERIOR ELEVATIONS
113 A512 - EXTERIOR ELEVATIONS
184 FP.09 - THIRD FLOOR PLAN FIRE PROTECTION AREA A
180 FP.05 - FIRST FLOOR PLAN FIRE PROTECTION AREA A
136 M3.1 - MECHANICAL SCHEDULES, & LEGENDS
183 FP.08 - SECOND FLOOR PLAN FIRE PROTECTION AREA B
185 FP.10 - THIRD FLOOR PLAN FIRE PROTECTION AREA B
178 FP.03 - DETAILS FIRE PROTECTION
181 FP.06 - FIRST FLOOR PLAN FIRE PROTECTION AREA B
172 E4.1 - LEGENDS, DETAILS AND NOTES
154 P4.1 - PLUMBING SCHEDULES &DETAILS
072 A011 - ARCHITECTURAL SITE PLAN
31-231845 Proposed 1577 Rock Springs Road (Smyrna, Tennessee) - Final Revised
07460 FIBER CEMENT SIDING
051 S223.1 - PARTIAL ROOF FRAMING PLAN
034 S101 - 3D VIEWS
085 A215 - COMPOSITE ROOF PLAN
155 P4.2 - PLUMBING DETAILS
177 FP.02 - SITE PLAN FIRE PROTECTION
038 S214 - COMPOSITE ROOF FRAMING PLAN
080 A200 FLOOR PLAN LEGENDS AND NOTES 021624
117 A623 WALL SECTIONS 021624
21.2 Specifications (Architectural)
176 FP.01 - COVER SHEET FIRE PROTECTION
137 M3.2 - MECHANICAL DETAILS
052 S223.2 - PARTIAL ROOF FRAMING PLAN
175 E4.4 - FIRE STOPPING DETAILS
092 A224 DUMPSTER ENCLOSURE 021624
21.2 Specifications (Engineering)
04210 CLAY MASONRY UNITS
019-C4.5 - Pipe & Structure Tables
014-C4.0 SEWER PROFILES 062524
015-C4.1 - Utility Plan
012-C3.1 PIPE & STRUCTURE TABLES 062524
017-C4.3 - Sewer Profiles
002-C0.1 GENERAL NOTES 062524
010-C2.3 UTILITY PLAN 062524
003-C0.2 MASTER PLAN 062524
001-C0.0 SITE COVER 062524
018-C4.4 - Road Profiles
022-C5.2 DETAILS 062524
020-C5.0 DETAILS 062524
009-C2.2 UTILITY PLAN 062524
004-C1.0 EXISTING CONDITIONS, DEMO & INITIAL EPSC PLAN 062524
005-C1.1 INTERMEDIATE EPSC PLAN 062524
007-C2.0 SITE PLAT 062524
008-C2.1 SITE PLAN 062524
006-C1.2 INTERMEDIATE 2 EPSC PLAN 062524
016-C4.2 - Grading, Drainage & Final EPSC Plan
011-C3.0 GRADING, DRAINAGE & FINAL EPSC PLAN 062524
021-C5.1 DETAILS 062524
023-C5.3 DETAILS 062524
013-C3.2 - Bridge Details
026- PH 2.0 - Photometric Fixture Schedule
008-C3.1 BRIDGE DETAILS 062524
006-C2.0 PRELIMINARY PLAT 062524
007-C3.0 GRADING, DRAINAGE & FINAL EPSC PLAN 062524
016-C5.1 DETAILS 062524
024- PH 1.0 - Photometric
013-C4.5 PIPE & STRUCTURE TABLES 062524
014-C4.6 WATERLINE PROFILES 062524
012-C4.4 ROAD PROFILES 062524
025- PH 1.3 - Photometric
011-C4.3 SEWER PROFILES 062524
010-C3.3 TRAFFIC CONTROL 062524
002-C0.1 GENERAL NOTES 062524
015-C5.0 DETAILS 062524
017-C5.2 DETAILS 062524
001-C0.0 COVER SHEET 062524
003-C0.2 MASTER PLAN 062524
005-C1.1 INTERMEDIATE EPSC PLAN 062524
004-C1.0 EXISTING CONDITIONS, DEMO & INITIAL EPSC PLAN 062524
009-C3.2 BRIDGE DETAILS 062524
005- L4.0 - Landscape Plan
003- L2.0 - Landscape Plan
004- L3.0 - Landscape Plan
001- L1.0 - Landscape Plan
002- L1.1 - Landscape Plan