Drydocking and Repair of PF205 Patrol Boat
MARITIME ADMINISTRATION
6933A226Q000011
]jrrf drydocking and repair of the pf205 patrol boat
The U.S. Department of Transportation (DOT), Maritime Administration (MARAD), James River Reserve Fleet (JRRF), requires dry docking and repair services for the PF205 Patrol Boat. The work is to be performed at a contractor's facility located in the Hampton Roads area, which includes the James River, all branches of the Elizabeth River, York River, Mobjack Bay, and their tributaries. The period of performance for the dry-docking is 60 days upon delivery of the vessel. Services include, but are not limited to, dry docking, hull cleaning and painting, ultrasonic testing, plate renewal and structural repairs, fuel tank cleaning and inspection, rudder and propeller shaft removal, inspection, and reinstallation, cabin windshield repair, main deck hatch gasket replacement, and renewal of sea valves and hoses. The contractor will also be responsible for providing necessary labor, materials, equipment, fire protection, compressed air, and temporary lighting. Government-furnished equipment will be provided for items such as zinc replacements, shaft zincs, rudder zincs, and shaft seals.
| Title | Date Posted |
|---|---|
| Attachment 1 PF205 PATROL BOAT SOW .pdf | May 12, 2026 12:00 PM |
| Attachment 3 FAR CD 2025-01 and 02.pdf | May 12, 2026 12:00 PM |
| Combined Synopsis Solicitation 6933A226Q000011.pdf | May 12, 2026 12:00 PM |
| Attachment 2 PF-205 PRICING SHEET.xlsx | May 12, 2026 12:00 PM |
| Attachment 4 Government Furnished Equipment List.pdf | May 12, 2026 12:00 PM |
| Attachment 5 E-Invoicing Instructions.pdf | May 12, 2026 12:00 PM |
| Combined Synopsis Solicitation 6933A226Q000011 A00001.pdf | May 19, 2026 12:00 PM |
| Combined Synopsis_Solicitation 6933A226Q000011_A00001 Questions and Answers.pdf | May 19, 2026 12:00 PM |
| Attachment 5 E-Invoicing Instructions A00001.pdf | May 19, 2026 12:00 PM |