Common Tactical Truck (CTT) Commercial Solutions Opening (CSO)

The Department of the Army is seeking commercial solutions for the Common Tactical Truck (CTT) program, which aims to modernize its heavy tactical vehicle fleet.

DEPT OF THE ARMY


General
Open (active)
W912CH-26-S-C001
Mar 19, 2030 07:00 PM
Mar 19, 2026 10:45 AM
Request for Proposal (RFP)
Federal
Original Solicitation Links
Contact
Common Tactical Truck Team
Description

The Department of the Army, through its Product Director for the Common Tactical Truck (CTT) program, is issuing a Commercial Solutions Opening (CSO) to procure commercial products, services, or non-developmental items for the modernization of its Heavy Tactical Vehicle Fleet. This initiative aims to replace the capabilities of the Palletized Load System (PLS), Heavy Expanded Mobility Tactical Truck (HEMTT), and M915 Line Haul Tractor with advanced solutions. The CTT program seeks solutions that are commercially available or require minimal modifications, prioritizing reliability and the use of existing commercial platforms. The program encompasses six variants: Load Handling System (LHS), Line Haul Tractor (LHT), Tanker, Wrecker, Off Road Tractor (ORT), and Cargo. Desired attributes include mild-hybrid propulsion, advanced driver assistance systems (ADAS), autonomy-readiness, drive-by-wire technology, and compliance with modern safety and deployment standards. The Army also emphasizes "Right to Repair" provisions. This CSO utilizes a phased approach, potentially including submission of a written solution brief, a presentation, and a request for a Commercial Solution Proposal (CSP). Contracts awarded may be fixed-price or fixed-price incentive fee, and the CSO is open for solicitations through April 2032. Interested companies are encouraged to monitor www.SAM.gov for new Areas of Interest (AoIs).

Classification Codes
NAICS336120Heavy Duty Truck Manufacturing
PSC2355Combat, Assault, and Tactical Vehicles, Wheeled
Smart Codes
tactical trucksheavy vehicle fleet modernizationcommercial product procurement
Timeline
Mar 19, 2026 12:00 PM-Area of Interest 001 Release Date
Apr 06, 2026 12:00 PM-Area of Interest 001 Questions Due Date
Mar 19, 2030 12:00 PM-Area of Interest 001 Close Date
Apr 03, 2030 12:00 PM-CSO Inactive Date
Documents
TitleDate Posted
CTT CSO Solicitation.pdfMar 19, 2026 12:00 PM
CTT Increment 1 AoI.pdfMar 19, 2026 12:00 PM