Construction of Well 30
Beaumont-Cherry Valley Water District
The Beaumont Cherry Valley Water District is soliciting bids for the construction of Well 30. This project involves drilling a new municipal supply water well, including all necessary labor, materials, equipment, and methods for its complete installation. The scope includes site preparation, drilling of conductor and pilot boreholes, installation of casing and sanitary seals, downhole geophysical surveys, potential aquifer zone testing, and final well development and testing. The project also includes the construction of a well pump foundation and all associated finishes. The construction will adhere to strict standards, including those set by the State of California Water Well Standards, AWWA, and local regulations. Bidders are required to have specific experience in well construction using reverse circulation drilling methods and must provide detailed project histories and qualifications. The project involves extensive documentation and submittals, including daily logs, shop drawings, material samples, and final record drawings. Key activities include drilling to a depth of approximately 1,250 feet, installing various types of casing and screen, gravel packing, and annular seals. The project also specifies detailed procedures for well development through mechanical and chemical methods, pumping tests, and disinfection. All work must comply with environmental regulations, including stormwater pollution prevention and proper disposal of drilling fluids and cuttings.