Waccamaw River Boardwalk and Dock Construction

The State of South Carolina is seeking construction services for a permanent dock, floating dock, and a 1,921 linear foot wooden boardwalk along the Waccamaw River.

City of Conway


General
Open
26-HOS-001
Jun 23, 2026 12:00 PM
May 21, 2026 12:00 PM
Invitation for/to Bid (IFB/ITB)
State
Original Solicitation Links
Contact
Amanda Hooper
Description

This project involves the construction of a permanent dock and a floating dock along the Waccamaw River. Additionally, a wooden boardwalk, approximately 1,921 linear feet in length, will be constructed, connecting to Depot Road. All associated appurtenances are included in the scope of work. The contract is divided into two divisions with specific time limits: Division 1: 180 consecutive calendar days. Division 2: 365 consecutive calendar days.

Classification Codes
NAICS237990Other Heavy and Civil Engineering Construction
PSC1945Pontoons and Floating Docks
Smart Codes
boardwalk constructionpermanent dock constructionfloating dock construction
Timeline
May 21, 2026 12:00 PM-Advertisement Publish Date
Jun 23, 2026 12:00 PM-Bid/Submittal Date