Refrigeration Equipment for VA CMOP Lancaster
DEPARTMENT OF VETERANS AFFAIRS
This is a Sources Sought Notice for market research regarding refrigeration equipment for the Department of Veterans Affairs Consolidated Mail Outpatient Pharmacy (CMOP) in Lancaster, Texas. The requirement includes the installation of a new 40-foot refrigerated shipping container (walk-in freezer) with a temperature range of -40 to 86 degrees Fahrenheit, and a walk-in cooler. The project involves the complete installation of the units, including disconnection and removal of existing equipment, installation of new refrigeration units, electrical work, and weatherproofing. The scope of work includes providing all necessary personnel and services for a turnkey project. The new freezer unit will store perishable medications, and the walk-in cooler will also be installed. The contractor must ensure all equipment meets Original Equipment Manufacturer (OEM) specifications and maintains OEM warranties. The installation requires compliance with OSHA standards and must be performed by qualified, licensed refrigeration technicians. The contractor is responsible for all permits, waste disposal, and ensuring work does not impact facility operations. A 1-year parts, labor, and workmanship warranty is required, with a 4-year warranty on parts.
| Title | Date Posted |
|---|---|
| 36C77026Q0117.docx | Apr 03, 2026 12:00 PM |
| P02_Freezer PWS Appendix DRAFT.docx | Apr 03, 2026 12:00 PM |
| P02_Refrigertor PWS New Walkin Cooler.docx | Apr 03, 2026 12:00 PM |
| P02_Freezer PWS New Walkin Freezer DRAFT.docx | Apr 03, 2026 12:00 PM |
| P07_Wage Determination_2015-5227.pdf | May 11, 2026 12:00 PM |
| 36C77026Q0117_2.docx | May 11, 2026 12:00 PM |
| 52.225-6 TRADE AGREEMENTS CERTIFICATE.docx | May 11, 2026 12:00 PM |
| P09_Refrigertor PWS New Walkin Cooler FINAL.docx | May 11, 2026 12:00 PM |
| P09_Freezer PWS New Walkin Freezer Appendix FINAL.docx | May 11, 2026 12:00 PM |
| S02_Solicitation_Attachment_Pricing SpreadSheet_RFQ_36C77026Q0117.xlsx | May 11, 2026 12:00 PM |
| P09_Freezer PWS New Walkin Freezer FINAL.docx | May 11, 2026 12:00 PM |