Navajo-Gallup Water Supply Project (NGWSP) Block 2-3 Pipeline

The Bureau of Reclamation is seeking sources for the construction of the Navajo-Gallup Water Supply Project (NGWSP) Block 2-3 Pipeline, which involves approximately 11.9 miles of buried water transmission pipe and two storage tanks.

Bureau of Reclamation


General
Open
140R4026B0001
Jun 30, 2026 04:00 PM
Apr 27, 2026 06:32 PM
$150,000,000.00
Sources Sought
Federal
Original Solicitation Links
Contact
Tyler Spencer
+18015243653
125 South State Street, Salt Lake City, UT, USA
Description

The U.S. Bureau of Reclamation has a requirement for the construction of the Navajo-Gallup Water Supply Project (NGWSP) Block 2-3 Pipeline. This project is located along the San Juan Lateral and involves approximately 6.0 miles of 42-inch diameter buried water transmission pipe and 5.9 miles of 48-inch diameter buried water transmission pipe. It also includes the construction of two 0.3 million-gallon ground-level storage tanks, wash crossings, bored crossings, precast manhole structures, concrete thrust collars, tapers, and encased miter bends, buried manholes, valves, air valves, blowoffs, road crossings, utility crossings, erosion control, cathodic protection, and Supervisory Control and Data Acquisition (SCADA) equipment with fiber optic cabling. The estimated magnitude of this project is between $100,000,000 and $150,000,000.

Classification Codes
NAICS237110Water and Sewer Line and Related Structures Construction
PSCY1NECONSTRUCTION OF WATER SUPPLY FACILITIES
Smart Codes
pipeline constructionwater transmission pipestorage tanks
Timeline
Apr 27, 2026 06:32 PM-Published Date
Jun 30, 2026 04:00 PM-Response Date
Jul 15, 2026 12:00 PM-Inactive Date