Leonard Treated Water Pipeline to Farmersville Delivery Point
City of Bentonville Water Department
The North Texas Municipal Water District (NTMWD) is soliciting bids for the installation, testing, and start-up of approximately 62,200 linear feet of pre-purchased 48-inch diameter water transmission main. The project includes furnishing and installing all necessary fittings, valves, appurtenances, and improvements for access during construction and future maintenance. Additionally, the scope involves furnishing and installing approximately 2,270 linear feet of minimum 68-inch inner diameter steel casing pipe. The 48-inch steel pipe has been pre-purchased by NTMWD and will be supplied by Northwest Pipe. The steel casing, however, was not pre-purchased and will be supplied by the contractor. The estimated construction cost (OPCC) range for this project is $65-80 million.