Construction of Miller City Swimming Pool

The City of Miller, South Dakota is seeking bids for the construction of a new outdoor swimming pool, including all associated mechanical and general construction work, as well as demolition of the existing pool.

City of Miller, South Dakota


General
Open
001113
Jun 16, 2026 07:00 PM
May 16, 2026 12:00 PM
Invitation for/to Bid (IFB/ITB)
Local
Original Solicitation Links
Contact
Carol
carolt@burbachinc.com
+16083483262
Platteville, WI, USA
Description

The City of Miller, South Dakota is soliciting bids for the construction of a new outdoor swimming pool. The project encompasses several key areas: Pool Construction: This includes the building of a reinforced concrete pool with integral deep manhole, excavation, fill, and micropile foundations. It also covers the concrete deck, deck drains, waterslide assembly, dive board foundation, pool deck equipment, shade structures, and floatable anchors. Incidental demolition, grading, limited site work, painting, and electrical bonding are also part of this scope. Pool Mechanical Construction: This involves precast concrete containment tanks, excavation, underdrains, piping systems for recirculation, heating, and filtration. It also includes disinfection systems, a multi-level play structure with water features, and waterslide piping. Dewatering pumps, process controls, electrical equipment, and bonding are also included. General Construction: This covers excavation, fill, grading, trenching, stormwater management, and erosion control. It also includes sodding, seeding, security fencing, gate installation, concrete pads, driveway paving, and the construction of a mechanical building with MEP services. Pump house concrete work, bathhouse siding, and site utilities (sanitary sewer, potable water, drain waste vent, yard hydrants) are also part of this scope, along with LP tank relocation and electrical distribution. Pool Demolition: The project requires the demolition of the existing outdoor swimming pool, including the kiddie pool, main pool, pipe networks, concrete decks, slide foundation, and site concrete. Protection of existing utilities and structures (Bathhouse and Pump House) is also required.

Classification Codes
NAICS236220Commercial and Institutional Building Construction
PSCY1FBCONSTRUCTION OF RECREATIONAL BUILDINGS
Smart Codes
swimming pool constructionsite workmechanical systems installation
Timeline
Jun 02, 2026 12:00 PM-Pre-Bid Meeting (required)
Jun 15, 2026 12:00 PM-Pre-qualification Submission Deadline
Jun 16, 2026 12:00 PM-Bid Submission Deadline
Jun 29, 2026 12:00 PM-Potential Award Date