Independence Boulevard Pump Station 346 Permanent Bypass and Electrical Upgrades
Virginia Beach
This project involves significant upgrades and replacements at the Independence Boulevard Pump Station 346. Key aspects include the installation of a permanent bypass pump, replacement of station piping, and upgrades to electrical equipment. Additionally, the project encompasses sanitary sewer pipe rehabilitation and general site improvements. The scope of work also includes demolition of existing structures, earthwork, cast-in-place concrete for various components, and the installation of new equipment such as factory-assembled vacuum stations and submersible chopper pumps. The project also requires extensive electrical work, including motor control panels, generators, automatic transfer switches, and lighting systems, all designed to meet stringent safety and operational standards. Furthermore, the project specifications detail requirements for various metal fabrications, including stairs, handrails, and hatches, as well as sheet metal flashing and trim, joint sealants, and painting to ensure durability and corrosion resistance in the demanding environment of a pump station.