SUNY SCCC Elston Hall Boiler Room Shoring
The County of Schenectady is seeking bids for shoring work in the boiler room of SUNY SCCC Elston Hall.
Schenectady County
General
Closed
RFB-2026-16
Apr 09, 2026 05:00 PM
Mar 05, 2026 01:30 PM
Invitation for/to Bid (IFB/ITB)
Local
Original Solicitation Links
Original Solicitation Links
[
RFB-2026-16
]suny sccc elston hall boiler room shoring
Description
Description
The County of Schenectady is soliciting bids for the SUNY SCCC Elston Hall Boiler Room Shoring project. The work involves installing temporary shoring for a damaged beam and column in the boiler room to stabilize the area while existing conditions are investigated. Digital copies of specifications can be obtained from BidNet Direct or by requesting them from the Purchasing Department. A mandatory pre-bid walkthrough is scheduled for two dates, and attendance at one is required for bid disqualification. Proposals must be submitted in a sealed envelope by April 9, 2026, at 1:00 PM.
Classification Codes
Classification Codes
NAICS238290Other Building Equipment Contractors
PSCJ045Maintenance, Repair and Rebuilding of Equipment: Plumbing, Heating, and Waste Disposal Equipment
Smart Codes
Smart Codes
boiler room shoringstructural steelmechanical and plumbing systems
Timeline
Timeline
Mar 05, 2026 12:00 PM-Publication Date
Mar 12, 2026 12:00 PM-On-Site Walkthrough #1 (required)
Meet at the Elston Hall Welcome Center.
Mar 19, 2026 12:00 PM-On-Site Walkthrough #2 (required)
Meet at the Elston Hall Welcome Center.
Mar 26, 2026 12:00 PM-Questions Due Date
Apr 09, 2026 12:00 PM-Bid Submission Deadline
Documents
Documents
| Title | Date Posted |
|---|---|
| RFB-2026-16 SUNY SCCC Elston Hall Boiler Room Shoring.pdf | Mar 04, 2026 03:50 PM |
| RFB-2026-16 Drawings.pdf | Mar 04, 2026 03:50 PM |
| RFB-2026-16 Notice to Bidders.pdf | Mar 04, 2026 03:50 PM |
| RFB-2026-16 Prevailing Wage Packet.pdf | Mar 04, 2026 03:50 PM |