Cesar Chavez Elementary School Chiller Replacement

The Eugene School District 4J is seeking a replacement chiller for Cesar Chavez Elementary School, with proposals due by June 9, 2026.

Eugene School District 4J Facilities


General
Open
S-P20004-00017022
Jun 09, 2026 02:00 PM
May 22, 2026 08:47 AM
Request for Proposal (RFP)
Local
Contact
Kathy Boozer
715 West 4th Avenue, Eugene, OR, USA
Description

This project involves the demolition of an existing air-cooled chiller and associated outdoor piping and electrical conduit and wire. A replacement chiller of the same type and approximately the same size will be installed in the same location as the original. The scope also includes the installation of new piping, electrical conduit, and wiring to the new chiller, along with all related accessories. The project also requires startup, testing, adjusting, and balancing, as well as training for the District Facilities O&M Staff.

Classification Codes
NAICS238220Plumbing, Heating, and Air-Conditioning Contractors
PSCJ041Maintenance, Repair and Rebuilding of Equipment: Refrigeration, Air Conditioning, and Air Circulating Equipment
Smart Codes
chiller replacementhvac systemsfacility maintenance
Timeline
May 22, 2026 12:00 PM-Posted Date
Jun 02, 2026 12:00 PM-Pre-Bid Meeting (optional)
In front of the school
Jun 09, 2026 12:00 PM-Due Date