Parking Lot and Driveway Improvements

Clearview Regional Middle School / High School is seeking contractors for parking lot and driveway improvements including asphalt milling, paving, concrete work, striping, and signage.

CLEARVIEW REGIONAL HIGH SCHOOL DISTRICT


General
Closed (past due)
5162B7
May 20, 2026 12:00 PM
May 20, 2026 12:00 PM
$1,800,000.00
Request for Proposal (RFP)
Local
Contact
Rachel Carver
rcarver@fvhdpc.com
+16098837101
1515 Lower Ferry Road, Trenton, NJ, USA
Description

Clearview Regional Middle School / High School requires comprehensive site work for parking lot and driveway improvements. The project scope includes variable depth milling of existing parking lots with an asphalt HMA surface course, construction of new parking lot areas, pavement repair, and thermoplastic striping and directional traffic markings. Additionally, the project involves installing a concrete driveway apron, wheel stops, ADA curb ramps, concrete curbing, 4-inch thick concrete sidewalks with detectable warning surfaces, traffic signage, and rebuilding inlets and catch basins as indicated on the drawings. The estimated project cost is $1.8 million.

Classification Codes
NAICS238910Site Preparation Contractors
PSCY1LZCONSTRUCTION OF PARKING FACILITIES
Smart Codes
asphalt pavingconcrete worksite improvements
Timeline
May 20, 2026 12:00 PM-Posted Date
May 20, 2026 12:00 PM-Due Date