Heavy Equipment Rental Services for Eielson AFB

The Department of the Air Force is seeking heavy construction equipment rental services for Eielson AFB, AK, with a period of performance from June 15, 2026, to August 15, 2026.

DEPT OF THE AIR FORCE


General
Open (active)
FA500426Q0018
Jun 02, 2026 08:00 PM
May 18, 2026 06:13 PM
Small Business (SB)
Request for Quote/Qualifications (RFQ)
Federal
Original Solicitation Links
Contacts
John Fertulus
+13173773506

Mr. Michael Lenze
+19074606023
Description

This solicitation is for the lease of heavy construction equipment to support the 354th Range Squadron (RANS) mission at Eielson Air Force Base, Alaska. The period of performance is estimated to be 61 calendar days, from June 15, 2026, to August 15, 2026. The contractor will be responsible for providing all necessary personnel, equipment, materials, and supervision for the lease of fully functional heavy equipment vehicles. All leased equipment must be manufactured in 2015 or newer and meet specified salient characteristics. The contractor is responsible for all scheduled and unscheduled maintenance, including parts, labor, and fluids, at no additional cost to the government. Emergency service calls for malfunctioning equipment must be responded to within 24 hours, with a replacement vehicle provided within 48 hours if the equipment cannot be repaired. The specific equipment required includes three 30-ton articulated rock trucks, one all-wheel-drive motor grader with rippers, one small crawler dozer, one large crawler dozer, one hydraulic excavator, two vibratory soil compactors, and two 4,000-gallon water trucks. Delivery and pickup of equipment will be at Building 2721, Central Avenue, Eielson AFB, AK 99702, or the Yukon Training Area (YTA) at Eielson AFB, AK.

Classification Codes
NAICS532412Construction, Mining, and Forestry Machinery and Equipment Rental and Leasing
PSCW038Lease or Rental of Equipment: Construction, Mining, Excavating, and Highway Maintenance Equipment
Smart Codes
heavy equipment rentalconstruction vehicle leasearctic operations support
Timeline
May 18, 2026 12:00 PM-Publication Date
Jun 02, 2026 12:00 PM-Offers Due Date
Jun 15, 2026 12:00 PM-Period of Performance Start Date
Aug 15, 2026 12:00 PM-Period of Performance End Date