Riverside Bridge Rehabilitation Project
Southwest Ohio Regional Transit Authority Facilities
056-2026
]riverside bridge rehabilitation
The Southwest Ohio Regional Transit Authority (SORTA) is soliciting bids for the rehabilitation of its Railroad Bridge (Bridge No. 3105733) located over Riverside Drive in Cincinnati, Ohio. The project involves comprehensive rehabilitation work in accordance with specifications and construction plan drawings prepared by HDR Engineering, Inc. Key tasks include structural steel repairs, maintenance of traffic, and painting. Cast-in-place concrete and reinforcing steel work are also included. The scope of work encompasses verification of existing conditions, ensuring safety, managing interference with rail traffic, implementing maintenance of traffic plans for Riverside Drive, providing temporary site access, and performing work on structural steel, miscellaneous steel, and bridge steel painting.
| Title | Date Posted |
|---|---|
| A - General_Terms_and_Conditions | Apr 16, 2026 04:44 PM |
| Riverside_Bridge_Rehabilitation.pdf | Apr 27, 2026 04:21 PM |
| D - Bid Sheet | Apr 16, 2026 04:49 PM |
| E - Right of Entry Application | Apr 16, 2026 04:49 PM |
| C - ConstructionPlansSORTABridgeNo.3105733 (dated: 8/20/2024) | Apr 16, 2026 04:49 PM |
| F - Additional Insurance Requirements | Apr 16, 2026 04:49 PM |
| Riverside_Bridge_Rehabilitation_(Addendum_#1_Revision).pdf | May 04, 2026 09:46 AM |
| B - SpecificationsSORTABridgeNo.3105733 (dated: 7/10/2024) | Apr 16, 2026 04:49 PM |
| #2 056-2026-02-Site Visit Sign-In | May 08, 2026 01:28 PM |
| Riverside_Bridge_Rehabilitation_(Addendum_#2_Revision).pdf | May 08, 2026 01:29 PM |
| Riverside_Bridge_Rehabilitation_(Addendum_#3_Revision).pdf | May 15, 2026 03:28 PM |
| Riverside_Bridge_Rehabilitation_(Addendum_#5_Revision).pdf | May 21, 2026 02:51 PM |
| #4 056-2026-02-Q&A Report | May 20, 2026 09:39 AM |
| #5 Attachment G - SORTA Bridge No. 3105733_Ballast Retention Detail 2026-05-21 | May 21, 2026 02:51 PM |