Boardwalk Materials for Bear River Migratory Bird Refuge
The U.S. Fish & Wildlife Service is seeking materials for boardwalk construction at the Bear River Migratory Bird Refuge.
US FISH AND WILDLIFE SERVICE
General
Open
140FGA26Q0022
May 27, 2026 07:00 PM
May 22, 2026 12:28 AM
Request for Quote/Qualifications (RFQ)
Federal
Original Solicitation Links
[
140FGA26Q0022
]56--boardwalk materials for bear river migratory birds
[
140FS126Q0093
]ca-sf bay delta fwo-fish rearing support
Contacts
Justine Coleman
+14132538287
5275 Leesburg Pike, Falls Church, VA, USA
Michael Dunphy
+14357203766
Michael Wandersee
+17208138224
Denver Federal Centre, CO, USA
Description
The U.S. Fish & Wildlife Service requires materials for boardwalk construction at the Bear River Migratory Bird Refuge in Brigham City, UT. The materials needed include stainless steel handrails, posts, cables, hardware, and toe boards for the West Boardwalk, along with a lighting system. The East Boardwalk requires fiberglass composite driven piles. All materials must be delivered to the Bear River Migratory Birds Refuge in Brigham City, UT.
Classification Codes
NAICS332311Prefabricated Metal Building and Component Manufacturing
PSC5680Miscellaneous Construction Materials
Smart Codes
boardwalk construction materialsfiberglass composite pilesstainless steel railing
Documents
| Title | Date Posted |
|---|---|
| Sol_140FGA26Q0022.pdf | Apr 23, 2026 12:00 PM |
| B08_-_140FS126Q0093_Solicitation_Package.pdf | Apr 29, 2026 12:00 PM |
| A04_-_Performance_Work_Statement_(PWS).pdf | Apr 29, 2026 12:00 PM |
| A06_-_Bid_Schedule.pdf | Apr 29, 2026 12:00 PM |
| Sol_140FS126Q0093.pdf | Apr 29, 2026 12:00 PM |
| B09_Amendment_1_Q_A_Doc_0001.pdf | May 21, 2026 12:00 PM |
| Sol_140FGA26Q0022_Amd_0001.pdf | May 21, 2026 12:00 PM |